- Hakes C & D Disposal Landfill Expansion Project Draft Supplemental Environmental Impact Statement
- DSEIS Cover and Table of Contents (1.9 mb, 7 pgs.)
- Glossary and Companies Involved in DSEIS Preparation (2 mb, 9 pgs.)
- Executive Summary (1.8 mb, 3 pgs.)
- 1.0 Introduction (1.8 mb, 4 pgs.)
- 1.1 History of the Hakes Landfill
- 1.2 SEQR Status and Issues
- 1.3 Organization of the DSEIS
- 2.0 Description of Proposed Action (2.4 mb, 14 pgs.)
- 2.1 Project Purpose and Need
- 2.2 Location and Current Land Use
- 2.3 Layout and Capacity
- 2.3.1 Layout Plan
- 2.3.2 Capacity
- 2.4 Design, Construction and Operation
- 2.4.1 Introduction
- 2.4.2 Excavation/Construction Schedule
- 2.4.3 Liner System
- 2.4.4 Landfill Progression
- 2.4.5 Leachate Collection and Removal
- 2.4.6 Leachate Storage
- 2.4.7 Drainage Control
- 2.4.8 Environmental Monitoring
- 2.5 Closure and Post Closure
- 2.5.1 Closure Plans
- 2.5.2 Post Closure
- 3.0 Natural Resurces Assessment (3.1 mb, 25 pgs.)
- 3.1 Geology/Soils
- 3.1.1 Envirnmental Setting - Geology/Soils
- 3.1.2 Significant Environmental Impacts - Geology/Soils
- 3.1.3 Environmental Impacts Mitigation - Geology/Soils
- 3.2 Water Resources - Groundwater
- 3.2.1 Environmental Setting - Groundwater
- 3.2.2 Significant Environmental Impacts - Groundwater
- 3.2.3 Environmental Impacts Mitigation - Groundwater
- 3.3 Water Resources - Surface Water
- 3.3.1 Environmental Setting - Surface Water
- 3.3.2 Significant Environmental Impacts - Surface Water
- 3.3.3 Environmental Impacts Mitigation - Surface Water
- 3.4 Air Resources
- 3.4.1 Environmental Setting - Air Resources
- 3.4.2 Significant Environmental Impacts - Air Resources
- 3.4.3 Environmental Impacts Mitigation - Air Resources
- 3.5 Terrestrial and Aquatic Ecology
- 3.5.1 Environmental Setting - Terrestrial and Aquatic Ecology
- 3.5.2 Significant Environmental Impacts - Terrestrial and Aquatic Ecology
- 3.5.3 Environmental Impacts Mitigation - Terrestrial and Aquatic Ecology
- 4.0 Human Resources Assessments (2.5 mb, 16 pgs.)
- 4.1 Archeological and Historic Resources
- 4.1.1 Environmental Setting - Archeological and Historic Resources
- 4.1.2 Significant Environmental Impacts - Archeological and Historic Resources
- 4.1.3 Environmental Impacts - Archeological and Historic Resources
- 4.2 Transportation/Traffic
- 4.2.1 Environmental Setting - Transportation/Traffic
- 4.2.2 Significant Environmental Impacts - Transportation/Traffic
- 4.2.3 Environmental Impacts Mitigation - Transportation/Traffic
- 4.3 Land Use and Zoning
- 4.3.1 Environmental Setting - Land Use and Zoning
- 4.3.2 Significant Environmental Impacts - Land Use and Zoning
- 4.3.3 Environmental Impacts Mitigation - Land Use and Zoning
- 4.4 Noise
- 4.4.1 Environmental Setting - Noise
- 4.4.2 Significant Environmental Impacts - Noise
- 4.4.3 Environmental Impacts Mitigation - Noise
- 4.5 Visual
- 4.5.1 Environmental Setting - Visual
- 4.5.2 Significant Environmental Impacts - Visual
- 4.5.3 Environmental Impacts Mitigation - Visual
- 4.6 Demographics
- 4.6.1 Environmental Setting - Demographics
- 4.6.2 Significant Environmental Impacts - Demographics
- 4.6.3 Environmental Impacts Mitigation - Demographics
- 5.0 Unavoidable Adverse Impacts (1.7 mb, 1 pg.)
- 6.0 Alternatives (1.8 mb, 4 pgs.)
- 6.1 Alternative Sites
- 6.2 Alternative Size
- 6.3 Alternative Design
- 6.3.1 Leachate Collection System - Materials of Construction
- 6.3.2 Final Cover System
- 6.4 Alternative Land Use
- 6.5 No Action
- 7.0 Impacts on Growth (1.7 mb, 1 pg.)
- 8.0 Effects on the Use and Conservation of Energy (1.7 mb, 1 pg.)
- 9.0 Irreversible/Irretrievable Commitment of Resources (1.7 mb, 1 pg.)
- 10.0 Resources (1.7 mb, 1 pg.)
- Figures List
- Figure 1-1 thru Figure 1-4 PDF (12.1 mb, 4 pgs.)
- Figure 1-1 Site Location Plan
- Figure 1-2 Project Location Plan
- Figure 1-3 Site Plan - Expansion
- Figure 1-4 SEQR Flow Chart
- Figure 2-1 thru 2-6 PDF (13.1 mb, 6 pgs.)
- Figure 2-1 Existing Site Plan
- Figure 2-2 Cell Development
- Figure 2-3 Project Schedule
- Figure 2-4 Composite Liner/Groundwater Suppression
- Figure 3-1 thru Figure 3-6 PDF (13.4 mb, 6 pgs.)
- Figure 3-1 Surficial Geology Map
- Figure 3-2 Watershed and Aquifer Map
- Figure 3-3 Soil Type Distribution
- Figure 3-4 Covertype Map - Project Impact Area
- Figure 3-5 Covertype Map - Additional Study Area
- Figure 3-6 Wetland Map
- Figure 4-1 thru 4-6 PDF (13 mb, 6 pgs.)
- Figure 4-1 Typical Sound Levels
- Figure 4-2 Site Plan For Noise Study - Full Build Out
- Figure 4-3 Noise Simulation Results - Full Build Out
- Figure 4-4 Noise Simulation Results - Full Build Out
- Figure 4-5 Site Plan for Noise Stiudy - Reduced Cell Area for Sound Mitigation
- Figure 4-6 Noise Simulation Results - 300-Foot Setback
- Figure 4-7 thru 4-12 PDF (13.8 mb, 6 pgs.)
- Figure 4-7 Noise Simulation Results - 300-Foot Setback
- Figure 4-8 Adjacent Property Owners
- Figure 4-9 Viewshed Map (Topographic - 5 miles)
- Figure 4-10 Viewshed Map (Topographic - 1 mile)
- Figure 4-11 Viewshed Map (Aerial Photograph - 5 miles)
- Figure 4-12 Viewshed Map (Aerial Photograph - 1 mile)
- Appendix A - SEQR Positive Declaration (1.8 mb, 6 pgs.)
- Appendix B - DSEIS Consolidated Scope
- Cover and Table of Contents (1.7 mb, 4 pgs.)
- 1.0 Introduction (1.7 mb, 2 pgs.)
- 2.0 Environmental Review Process (1.8 mb, 4 pgs.)
- 3.0 Project Description (2.1 mb, 9 pgs.)
- 4.0 Potential Environmental Impacts/Mitigation (2 mb, 8 pgs.)
- 5.0 Closure/Post Closure Plan (1.7 mb, 1 pg.)
- 6.0 Permits and Approvals Required (1.7 mb, 1 pg.)
- 7.0 Project Sponsor and Involved Agencies (1.7 mb, 1 pg.)
- 8.0 DSEIS Content and Organization (1.7 mb, 1 pg.)
- 9.0 References (1.7 mb, 1 pg.)
- Figures PDF (14.6 mb, 7 pgs.)
- Figure 2-1 SEQR Flow Chart
- Figure 3-1 Site Location Plan
- Figure 3-2 Proposed Development Area
- Figure 3-3 Bedrock Elevation Map
- Figure 3-4 Monitoring Location
- Figure 3-5 Typical Liner Detail
- Attachment A (1.7 mb, 3 pgs.)
- NYSDEC Letter Requesting Lead Agency Request
- Attachment B (21.4 mb, 37 pgs.)
- Letters from Involved and Interested Agencies and Public Comments
- Attachment C (1.7 mb, 2 pgs.)
- Prior SEQR Determinations
- Attachment D (1.8 mb, 6 pgs.)
- Attachment E (3.3 mb, 12 pgs.)
- Attachment F (10.9 mb, 7 pgs.)
- Protocol for Noise Analysis
- Appendix C1 - Air Registration Application and Certificate (10 mb, 8 pgs.)
- Appendix C2 - Air Registration Correspondence Regarding Expansion (9.6 mb, 5
pgs.)
- Appendix D - Ecological Study (13 mb, 18 pgs.)
- Appendix E - Key Correspondence Regarding Wetlands ( 13.6 mb, 6 pgs.)
- Appendix F - Archeological Correspondence (1.9 mb, 8 pgs.)
- Appendix G - Noise Evaluation Reports
- Appendix G-1
- Appendix G-2
- Appendix G-3
- Appendix G-4
- Appendix G-5
- Appendix H - Visual Resource Assessment
- Appendix I - Noise Easements (2.3 mb, 12pgs.)
- Appendix J - Road Maintenance Agreements (11.1 mb, 17 pgs.)
- Appendix K - Photographs of Erwin Hollow Creek (11 mb, 6 pgs.)
|