Ontario Co. Landfill

Breadcrumb

  • Ontario Co. Landfill
Alert

Scroll down below the map to see updates or click on the contact us button below to send us a note. 

Drop-off Hours:

Mon - Fri: 6:00 AM - 4:30 PM

Address:
3555 Post Farm Rd
Stanley, NY 14561
Driving Directions
Pay your Bill:
Casella
PO Box 1371
Williston, VT 05495-1371
Pay Online
Ontario Co. Landfill

2018 Holiday Schedule

Customer Care
  • Phone: (888) 852-2151
  • Mon - Fri: 7:00am - 5:00pm
  • Sat: 8:00am - 12:00pm
Office
  • Phone: (802) 438-2151
  • Mon - Fri: 8:00 AM - 5:00 PM
Personal Information
Contact Information
Inquiry
CAPTCHA This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Be in the know...Get email updates!

Sign up and receive periodic updates about the Ontario County Landfill and its construction progress.
Click here to sign up for email alerts
 

Landfill Hotline - Open 24/7

To report concerns related to the Ontario County Landfill, please call 888-230-2004.


June 14, 2018

Friday morning, June 15, the landfill gas-to-energy plant will be shutting down to perform normal maintenance procedures. The plant is expected to be back in operation in a couple hours, but during this downtime, it is likely some may notice landfill gas odors downwind of the facility.

The gas plant assures me that they will be down as little as possible and we hope this does not cause any concerns from people passing by. 
 
Please call the landfill office if you have any questions at 585-526-4420.

May 16, 2018

Starting this week, the landfill began drilling and installing 28 new landfill gas wells. These wells will extract methane from the landfill and use it in the gas-to-energy plant. This project should take a couple weeks to complete and during this time, there is a risk of increased odors. To lessen this risk, we’ve asked that the well be installed immediately after the hole is drilled and then to cap the wells before they are integrated into the existing gas collection system.

May 9, 2018

On Saturday, May 12 from 9am-3pm the City and Town of Geneva in collaboration with Casella will be holding a clean up “drive-thru” event. Two transfer stations are open to City and Town residents only. 

Locations:

  • Geneva City Transfer Station - 43 Doran Avenue
  • Geneva Town Transfer Station - 32 White Springs Road

We will be accepting mattresses, eWaste, lawn debris, cardboard, scrap metal, recycling, carpets, wood, paper, shingles, glass, furniture, framing, bulky items, and items that could be Good Will donations.

We will not be accepting lighting (bulbs), hazardous waste items, household trash, TVs, or batteries.

Pre-registration and proof of residency are required. To pre-register please contact Rhonda Destino at 315-828-6588 or rdestino@geneva.ny.us. Also, for elderly residents or persons with disabilities, we are able to schedule a pick up of your items. Please contact Rhonda for more details.

April 10, 2018

On April 4th, the region received heavy winds of 30+ mph with gusts in excess of 50 mph. The wind tore seven panels of netting along the eastern boundary and was strong enough to lean over two 40’ tall wooden poles. The wind event allowed trash to leave the site. An immediate cleanup and repair process began thanks to the help of Casella staff, temporary labor and two local construction companies.  This effort, with oversight from NYSDEC, will continue until the trash is fully picked up.

March 26, 2018

Casella, along with Ontario County will be hosting a Household Hazardous Waste Collection day. 

When: Saturday April 21, 2018, from 7 am to 3 pm.

Where: The Ontario County Landfill Recycling Facility, Routes 5 & 20 Seneca, NY.

This event is free and open to residents of Ontario County. Pre-registration and proof of residency will be required. To pre-register for the event, please call 585-394-3977 x427 before 3:30 pm on Friday, April 20. Call now! This event is open to the first 800 residents who register.

March 22, 2018

On March 12, we began construction of additional netting infrastructure to collect any waste or blowing papers along the eastern property boundary of the facility. The 40-foot-tall poles have been installed and the netting is scheduled to arrive soon. Along with this new netting infrastructure, we will be replacing the netting along the eastern boundary and adding a section at the southern entrance. This is expected to be completed in April 2018.

Zoladz Construction was selected as the company to build the 4.8-acre Cell 9C-2. Construction will begin in mid-April and will take approximately six months to complete.  We will keep you updated on timing as this project progresses.

We have been moving soil to the top of the landfill and mixing it with compost to add nutrients to the soil. The western slope will be covered with this soil and grass will be planted as weather permits in the spring months.

February 19, 2018

We are well underway in our newest cell, 9 C-1 of covering the liner with the first layer of selective trash. This “fluff layer” is made of specific trash types inspected and selected as to not cause any harm to the liner system. This will continue throughout the month and into March.

The next cell to be constructed is 4.8 acres and is called 9 C-2. We are in the process of selecting a construction company and anticipate construction start in April.

If you’ve driven past the site recently, you may have noticed that some trees have been cut down behind the manor. The trees had to be cleared to make way for a brand-new maintenance building, which will replace the existing building. Construction is scheduled to begin in May-June and will be completed this year.

With any break in the weather, we continue to work on stabilizing the western slope.  This project will continue until the slopes are stable enough to plant grass in the spring.

January 15, 2018

The construction of the newest area of the facility, Cell 9C-1, received approval from the DEC to begin operations on December 26, 2017. We began with the initial select layer of trash on the December 28.

With a small break in the weather this week, Casella continued to add soils to the western slopes and building stormwater controls, such as swales, down chutes and check dams.  These tasks should stabilize the slope and allow us to plant grass in the spring. This work will continue until weather forces us to stop the project.

The facility had a wind event on January 5, 2018, when high winds tore a section of litter netting at the south-east corner of the landfill and a sizable amount of litter left the property. With the help of professional tree climbers, Casella staff and a large group on temporary labor, we immediately began the process of picking up the litter and will not stop until it is cleaned up.

Landfill Hotline Reminder.  Casella takes our responsibility of protecting the environment very seriously.  If you wish to report a nuisance or any other concern related to the Ontario County Landfill, please call the toll free 1(888) 230-2004 hotline.  Facility staff will investigate all reported concerns and will use best efforts to determine the cause in order to better serve our community.

Have a safe and happy 2018.

December 18, 2017

The construction of the newest area of the facility, Cell 9C-1, is now complete. Casella has submitted the construction certification report to the NYSDEC and we anticipate approval in the next few weeks.  A large section of litter netting has been re-installed along the eastern edge of the property. This netting is instrumental in keeping any blowing litter contained onsite.

Casella continues to add additional soils on the western slopes and building stormwater controls, such as swales, down chutes and check dams. These tasks should stabilize the slope and allow us to plant grass in the spring. This work will continue until inclement weather forces us to stop the project.

The cleaning of sediment from stormwater ponds is complete for now, but we will be requesting permission from NYSDEC to do additional work in these ponds as necessary over the winter months to ensure we are fully prepared when the snow thaws.

Landfill Hotline Reminder.  Casella takes our responsibility of protecting the environment very seriously.  If you wish to report a nuisance or any other concern related to the Ontario County Landfill, please call the toll free 1(888) 230-2004 hotline.  Facility staff will investigate all reported concerns and will use best efforts to determine the cause in order to better serve our community.

Have a safe and happy holiday season!

November 9, 2017

The construction of the newest Cell, 9C-1, is almost complete and should be ready for receipt of solid waste in a couple months. Despite all of the recent rain, the construction crew did a great job at keeping on schedule. Now, final testing of the liner system is underway.

If you’ve driven by the site lately, you may have noticed extensive maintenance and upgrades have been performed on the side slopes. Many areas underwent additional slope stabilization, and 22 acres of the facility has had spray seeding applied to it. By spring there will be extensive amounts of green grass growing. Other slope areas to the south and west of the landfill have had a temporary cap installed. This synthetic cover helps control leachate and minimize odors.

Now that the rain has slowed down a little and before winter hits, the staff has been busy cleaning sediment that has collected in the various sediment ponds and ditches. We have also installed some berms and down chute along the north and west corner of the landfill to help with storm water controls.

August 17, 2017

NYSDEC has approved the installation of 13 new vertical gas collection wells. The installation of these wells is scheduled to begin on August 28. There will be a potential for odor outbreaks during the installation process. During Labor Day weekend, we will ensure that all work is closed up and sealed to minimize odors to the maximum extent possible. If you experience an odor related to the landfill please call the Hotline at 1-888-230-2004.

July 20, 2017

As any farmer will tell you, it has been a wet spring/early summer this year. Rain certainly adds challenges to moving equipment and dirt around the landfill. In spite of the rainy conditions, many of our projects this year are well underway.

Utility Line Relocation

We are happy to report that all of the utility relocations required for this year’s cell construction have been completed. This work included a scheduled shutdown of the power plant and operation of the gas flares which went as planned.

Cell Construction

Construction of Cell 9C-1, in the southeast corner of the site, has begun and, despite the rain, is surprisingly close to being on schedule. We anticipate construction of this new cell to be complete this fall. As with any new construction, we will be opening up areas of the landfill to complete the tie in of the liner. We will do our best to manage potential odor outbreaks.

Temporary Cap / Seeding

What has likely been impacted the most by the rain is our ability to get the slopes seeded or capped with temporary plastic covers. With the recent dry weather, we are able to start seeding next week and expect to begin temp cap installation by the beginning of August.

Gas Collection

Horizontal gas collectors continue to be installed in Cell 8A-1 as waste is placed and compacted. Additional vertical wells are planned for installation this fall.

Truck Turn Times

There has been some interest in how quickly local waste collection trucks can get in and out of the facility. The graph below shows continued improvement in turn times. We expect that the average times will stay below the target of 45 minutes per truck for the foreseeable future.

846acb19-dd81-4ad9-bf75-b4a96434e2eb.png

May 2, 2017

Spring is finally here!!

With spring comes a new construction season, and it will be a busy time again at Ontario County Landfill. 

Utility Relocation

The water line running through the expansion area has now been moved and placed in service.  In the next few weeks, you will be able to see new power poles going up along County Route 5.  Those power poles will carry the electricity from the power plant to consumers.  We expect that work will take four to six weeks.  Sometime in May the power plant will have to switch over to the new power lines.  That will take a couple of days, and during that temporary period of time, we will be operating the on-site flares.  We will provide a timing update as soon as the schedule is set for the tie-in.

Cell Construction

This year we will be building a new cell on the southeast corner of the facility.  Construction will begin in May and continue through October.

Gas Collection

We are continuously installing new gas collection lines and wells at the site.  NYSDEC has approved our plan for horizontal collection in the new Cell 8A-1 and that will be installed as we fill that cell.  We are also preparing designs for additional vertical wells to be place on top of the landfill and expect that work will be done in August.

Temporary Cap

We plan to install two temporary caps this year, one on the south and west side of the facility above the current cap, and one on the north side of Cell 9B-1.  We hope to have both installed by the end of September.

That’s all for now.  Stay tuned for more updates.

 

February 2, 2017

Greetings from the Ontario County Landfill!

As we reported last month, we have been working hard to complete our installation of expanded gas collection facilities, to further reduce odors.  We are happy to report that by the end of this week 31 new wells and 13 existing wells will be tied into the new header system.  This will complete this round of infrastructure installation however, we are already making plans for an additional, smaller installation sometime in the May – June time frame.  We will keep you posted.

Our new landfill cell on the west side of the landfill is also nearly complete and approved by NYSDEC to accept waste.  Sometime in the next month we will begin placing waste in the new cell.  Plans are nearly complete for the next cell which will be constructed this summer.  Stay tuned.

Next week, if you happen past the landfill on County Route 5, you will likely see a contractor installing an upgraded waterline along the road.  The waterline is being relocated to make room for future landfill cells and will replace the current, very old line that services many in the Town.  There should be little to no interruption in service.

During March and April, we will also be relocating some power and phone lines that run through the facility today.  These will also be installed along County Route 5.

 

December 24, 2016

As of December 22, we have now completed the installation of 31 new gas collection wells.  Before the end of the year these wells will be connected to the active collection system in order to begin producing gas for the electrical generation plant.  Recent odors associated with the drilling and installation of these wells will be greatly reduced now that all of the drilling is complete.  Over the next month and a half, all of these new wells will be connected to the vacuum system which will further reduce incidents of off-site odors.

If you would like to report an incident of odors or have concerns about the landfill operation, either call 585-526-4420 or click the link on this page to leave feedback.

Ontario Landfill wishes everyone a safe and happy holiday season!


October 14, 2016

The NYSDEC recently provided approval for waste filling within the first of the 2 new landfill cells being built this year. Filling within the first cell is now being initiated while construction of the second cell is on-going and will be completed later this year. 

Horizontal landfill gas collectors have been installed within the first cell prior to waste filling. In addition, plans are being developed for the addition of ~ 30 new landfill gas vertical collection wells that will be installed in 2017 along with horizontal collectors in both of the new cells. Plans are also being developed for 2018-2022 for additional landfill gas collection infrastructure. 


September 27, 2016

SATURDAY, OCTOBER 22nd from 9:00 am – 12:00 pm

Join us for a guided tour of the Ontario County Landfill and Recycling facilities. Ask our experts about landfill and recycling operations, and how you can reduce landfill waste by recycling and composting.

A fun filled day, free to everyone. The event is rain or shine.

  • Pumpkin painting
  • Bounce house
  • Recycling trucks onsite
  • Free food provided – donuts, bagels, cider, coffee, juice, cotton candy, popcorn & more!

August 22, 2016

Construction of the new landfill cells as part of the wrap around expansion is continuing on schedule. The new leachate lagoons and interim cell (#9) are now fully constructed.  Most recently the new pump station was successfully tested by our external engineers as required. Certification reports have been submitted to the NYSDEC for their review which following Department approval, the lagoons will be placed into operation.  All waste relocation activities as part of the construction of the expansion cell #8 have been completed and once the new lagoons are placed on line, the existing lagoon will be taken out of service and removed as part of the construction work necessary to finalize completion of cell #8. Waste placement currently continues on top of the landfill which upon approval from the DEC will be redirected to the front of the facility into cell #9 for approximately 3-4 months prior to moving into cell #9 pending DEC approval of that cell in the future.

Efforts are continuing to be made to expand the existing landfill gas collection system including installation of new horizontal gas collectors yet this year and new vertical wells in early 2017.

Additional efforts are currently underway to provide additional intermediate cover and erosion control measures on the eastern slopes of the landfill. 


June 2, 2016

The power plants were temporarily taken off line in order to complete additional gas collection system tie-ins that are now required as a result of the realignment and upgrades to the system.


May 17, 2016

The landfill cell construction and leachate infrastructure improvements projects are now well under way including the waste relocation activities. The relocation of the landfill collection system header and new condensate knock out installation are now complete.

As part of the daily operations, we have been continuing to regularly water the access and haul roads at the facility. We are proactively working on measures for controlling dust.


April 18, 2016

The power plants will be taken off line on Wednesday again to allow connection of the new 18" gas header lines on both the east and west sides of the facility. As in the past, the flares will be operated while the plants are off line. 

As previously reported, as part of the upcoming cell construction activities we will be relocating (older) waste in order to remove two manholes. This activity has been delayed pending final approval from the NYSDEC for this phase of the project.

Aside from the delay associated with the waste relocation, the construction work is on schedule.


March 22, 2016

The power plants have been taken off line today due to utility maintenance by NYSEG. We have been running the flares and expect the plant to be back on line later this evening. We anticipate that the plants will be taken off line again later this week for a short time as part of the new landfill cell construction activities (pending approval of that phase of the project by the NYSDEC).

Our prime contractor mobilized their equipment and started the leachate management infrastructure improvements project which has been approved by the NYSDEC. In addition, our landfill gas contractor has been continuing to proceed with installation of new lines that will be tied to the recently installed vertical gas wells (8) as well as re-alignment of the existing landfill gas collection header along the northern perimeter of the site.

As part of the upcoming cell construction activities, we will be relocating (older) waste in order to remove two manhole locations as part of an upgrade to a vertical side riser leachate removal system. We anticipate that the waste relocation will start during the second week of April. Based on our past successful experiences moving similar waste materials we will be prepared to manage odors as best as possible should they arise. The waste will be covered at the end of each day as required by the facility permit.


February 29, 2016

Installation of the 8 new vertical gas wells will be completed today. On March 8th we have a contractor starting who will be relocating a portion of the exterior landfill gas collection header in preparation for the upcoming landfill cell construction. Following realignment, of the header line, the 8 new gas wells will be connected to the existing gas collection system.

We have started to import clay for the upcoming construction project and we will soon be taking delivery of various materials that will be utilized during the construction including geomembrane liner and textile rolls and precast concrete manholes. We anticipate that the construction activities will commence in late March or early April depending on the weather. 

The two new landfill gas flares that are referenced in the new air permit will be arriving in early April and will installed shortly thereafter. All landfill gas continues to be beneficially utilized in the on-site landfill gas to energy facility.


February 5, 2016

We are continuing to expand the landfill gas collection system including the replacement of gas wells that were abandoned as part of the recent final cover removal project (both approved by the NYSDEC). Pending additional approval from the DEC, we are proposing to install eight (8) new vertical wells along the upper north section of the landfill. In addition to these upgrades, we are also planning to relocate the main gas header lines coming into the landfill gas to energy plants which is needed as part of the upcoming landfill expansion construction efforts.  We will also be installing two (2) new gas flares in the coming weeks as provided in the new air permit for the facility. 


December 7, 2015

The new vertical gas wells are now installed; 12 wells were installed even though 11 were anticipated. The DEC granted permission for the installation of the additional well. Three of the 12 wells have been connected to the gas collection system and are now conveying gas to the power plants. The remaining wells will be connected to the collection system over the next week as the new laterals are constructed.

The DEC recently provided approval for installation of ~5 acres of temporary cover along a portion of the western landfill slope. Construction of the temporary cap was commenced last week to allow preparation of the slope and installation of the geomembrane anchor trenches. Our geomembrane contractor will be on site later this week to begin deployment of the temporary cap. Weather permitting we anticipate completion of this project later next week.

The DEC also recently issued the new Part 360 operating permit for the landfill. As outlined in the new permit we will be opening the gates at 7 am rather than 6 am going forward.


October 28, 2015

Despite having just added a new main gas header line, we are once again planning to undertake an additional expansion of the landfill gas collection system beginning in mid-November (which has been approved by the NYSDEC).  We are planning to add 11 new vertical gas wells which will be tied into the existing gas collection system and should be on line by mid-December.

The north and a portion of the western side slopes have recently been seeded as we prepare for winter and we are continuing to clean out the two main stormwater retention ponds.

A majority of the final cover system has now been removed.


August 10, 2015

We have been filling the lower northern slope for the past few weeks where the final cover system was recently removed. As part of this effort, we will be installing horizontal gas collectors as the waste progression proceeds in this general area over the next several weeks. In addition, we are awaiting NYDEC approval for the installation of a new 10" landfill gas header line along the upper back portion of the landfill to provide additional vacuum to gas wells that were installed earlier this year. We are also looking into the installation of 10 - 12 new vertical gas wells which pending NYSDEC approval we hope to install this Fall. Lastly, we are planning (also pending DEC approval) to install ~ 5 acres of temporary exposed geomembrane along a portion of the back western side of the facility (expanding the existing geomembrane cap).  


July 7, 2015

We are continuing to successfully remove the final cover components along the eastern, northern and western edges of the first cells within the Phase III landfill. As part of this effort, we are also continuing to relocate and expand the landfill gas collection lines and/or we have temporarily shut off some gas wells (as allowed under the air permit). A vacuum will be safely restored to these wells following landfilling activities within these areas. 

In addition to the cover removal activities, we are also in the process of installing a new haul road along the back eastern slope.

Lastly, starting early next week we will be having a contractor continue with electric utility line relocation along the frontage of the facility near gas to energy facilities.  


June 10, 2015

We have been experiencing a significant amount of rain over the past several days. The rain has hampered at times the placement of cover soils. In addition, our current active filling area is located along the upper slope and furthest eastern edge of the landfill. We are working diligently to work through the inclement weather. We are also in the process of installing a new haul road along a section of the eastern slope as a means to facilitate future disposal operations within the western expansion area.


March 24, 2015

The recently installed vertical gas wells have all been connected to the gas collection system. We are now in the process of covering the

slopes that were impacted from the lateral and header line installations.

We are doing some testing of the 4 gas flares this afternoon and the power plants have temporarily been taken off line in order for us

to complete these tests. We anticipate the plants will only be off line for 60-75 mins this afternoon.


February 20, 2015

Good morning.

The recent harsh weather conditions have been hampering our ability to complete the installation of the newly installed gas collection system wells. We are doing our best to work through this situation.


January 28, 2015

Good morning. We have recently completed the installation of 20 new vertical gas wells which are now in the process of being connected to the existing gas collection system (and power plants). In parallel, we are also now starting to begin the installation of new horizontal gas wells which will provide additional gas collection as we continue to abandon older gas wells as fill progression continues.

IF YOU WISH TO LEAVE AN ODOR COMPLIANT PLEASE DO SO BY SELECTING THE "ask us a question" LINK ABOVE AND INPUT THE INFORMATION ACCORDINGLY. IT IS IMPERATIVE THAT THE EXACT DATE, TIME, AND MOST IMPORTANTLY PHYSICAL ADDRESS OF THE OBSERVED ODOR BE PROVIDED. YOU CAN ALTERNATIVELY CONTACT THE LANDFILL OFFICE AT 585-526-4420 AND LEAVE THE SAME INFORMATION.

TO SUBSCRIBE TO OUR REVERSE CALLING SYSTEM PLEASE DO SO BY SELECTING "Sign up for alerts" LINK ABOVE. BY DOING SO, YOU WILL BE PROVIDED WITH UPDATES REGARDING ANY EXPECTED OR UNEXPECTED OPERATIONAL ACTIVITIES THAT MAY HAVE THE POTENTIAL TO LEAD TO TEMPORARY ODORS.


December 29, 2014

We are once again planning to undertake an additional expansion of the landfill gas collection system beginning in mid-January pending approval from the NYSDEC.  We are planning to add 15 new vertical gas wells into the current working area.  

Lastly, we will be installing two new gas flares in late Spring 2015.


September 9, 2014

We are planning to undertake an additional expansion of the landfill gas collection system this year even though we just completed an expansion this year in June.  We are anticipating the installation of 3 additional horizontal wells and 2 vertical wells.  Construction and installation of the planned expansion will be taking place later this month and into October. Efforts are continuing with the covering of additional landfill gas collection system piping as well as efforts to begin pumping select gas wells to lower perched water levels and to enhance gas collection system performance in those areas.

Lastly, Our annual Household Hazardous Waste collection day is scheduled for Sat, Sept. 20th.  Appointments must be made in advance and can be done so by calling 585-526-4420.


June 6, 2014

Greetings. The landfill gas collection system expansion project has been completed. The new horizontal and vertical gas wells have been installed and have been connected to the active system drawing the new gas into the on-site power production facilities to produce electricity. Efforts are continuing with the covering of landfill gas collection system piping as wells as efforts to begin pumping select gas wells to lower perched water levels and to enhance gas collection system performance in those areas.


March 18, 2014

Good afternoon.  The Casella website was recently upgraded to include numerous changes. As a result of these changes the date headings for the updates provided below are unfortunately incorrect.

With Spring approaching we have secured New York State Department of Environmental Conservation approval to expand the active gas collection system. The upgrades include the addition of new vertical and horizontal gas collection lines within the current working area of the landfill.  The improvements are expected to take place in early to mid April and will include drilling within the landfill in order for the vertical wells to be installed. Some temporary odors may be present during this time period.  The gas that will be captured from the new improvements will be conveyed to the on-site power plants.


November 1, 2013

Good afternoon! As part of the ongoing south slope improvement projects at the landfill, contractors will be working at the facility this Sunday.

The recent high week have made it difficult to deploy the rolls of synthetic needed to finish the exposed cap, which has made this Sunday work necessary to stay on schedule.

The proposed work for Sunday will be confined to the installation of the geosynthetics only. As such, the only piece of heavy equipment that will be used will be the lift for deployment of the rolls. If you have any questions about the ongoing construction efforts please call the landfill office at 585.526.4420.


October 9, 2013

Good afternoon. The Ontario County Landfill is improving our infrastructure and we wanted you to know. Over the course of the next 9 weeks landfill contractors will be making several improvements to the landfill gas collection and stormwater diversion systems. The planned gas collection improvements will involve the installation of an 18" gas header along the south and west slopes of the operational landfill. This 18" header will replace the existing 12" header system. Additionally, exposed synthetic capping will be expanded along the above referenced slopes. After the gas work is completed the stormwater diversion swales along the bottom of these slopes will be reconstructed to ensure that stormwater continues to be effectively managed.

These improvements will allow us to do an even better job of collecting landfill gas, using it to produce electricity and reduce our greenhouse gas footprint. We’ll also be able to better manage how stormwater moves around and off the site.

During this project, you might notice a solid waste or gas odor in the immediate vicinity of the landfill. This odor will be temporary, and we’ll be making every effort to end each day’s construction activities in such a way as to limit odor leaving the site.

Should you have any questions, please call the landfill office at (585) 526-4420 and ask for Bob Walls or Jerry Leone.


August 8, 2013

Good afternoon. Landfill management has been notified by the landfill gas to energy facility staff that the power plant went down at 4:33PM this afternoon due to a utility trip. The utility trip was caused by strong storms in the area. The LFGTE Facility was unable to go back online due to downed lines in the vicinity. During the plant down time, landfill staff powered up one of the onsite flares so that landfill gas could continue to be collected and combusted efficiently.

As of the time of this message, approximately 6:19PM power plant staff have received word from the utility that they may begin to power back up. According to the plant employees, it is anticipated that the plant will be fully operational within the next hour.


July 20, 2013

Good afternoon. Landfill management has been notified by the landfill gas to energy facility staff that the power plant went down around 10AM this morning due to a utility trip. The utility trip was caused by strong storms in the area. As of 12PM this afternoon, all but 2 engines were back online and operational. The power plant staff will continue to diligently work on getting the additional 2 engines up and running. In the mean time, landfill staff have powered up one of the onsite flares so that landfill gas may continue to be collected and combusted efficiently.


July 8, 2013

Good afternoon. Expansion of the landfill gas collection system will occur over the course of the next two weeks. Construction contractors will be mobilizing to the site tomorrow morning (Tuesday July 9th). 7 vertical gas wells will be installed in an effort to continue the efficient collection of the landfill gas. It is expected that the installation effort will take approximately 2 weeks. However, the timeline for this activity may vary due to weather coniditions experienced at the site. During the construction process intermitant gas odors may be noticed around the landfill property. Should you have any questions please contact the landfill office at 585.526.4420 and ask for Robert Walls or Carla Jordan. Thank you.


April 1, 2013

Good afternoon. Landfill operations will be commencing with the installation of a 10 acre cap this week. Construction of the exposed synthetic membrane will occur on the South slope of the operational landfill. The construction will primarily involve the welding of green LLDPE panels. Although most of the work around the cap's anchor trench has already been performed, an additional 150 feet of trench area will need to be exposed to complete the construction effort. During the time that the anchor trench is exposed, landfill odors may be noticeable in the vicintiy of the landfill. Construction efforts are expected to be completed by the 15th of April, weather permitting. Any changes to the construction schedule or anticipated work load will be communicated further. If you have any questions, please feel free to call Fred Kober at the landfill office (585.526.4420).


March 28, 2013

March 28, 2013: An odor complaint was forwarded to the landfill office this afternoon by the Ontario County Planning Department. The original complaint was made around 6PM on March 27th. Due to the delayed report, landfill personnel could not respond to the complaint. A survey of the complaint area this afternoon resulted in no noticeable landfill odors observed. In order to provide responsive action, Casella will be working with the County to create a more timely complaint option for residents with any odor questions or concerns. In the mean time, please contact Fred Kober at the landfill office (585.526.4420) to report any landfill related odors.


March 22, 2013

Good afternoon! In an effort to better serve our community we want to make sure that any interested individual has the opportunity to tour the landfill facility. The landfill property hosts both an active municipal solid waste landfill and a state of the art Zero Sort recycling facility. An independently owned and operated landfill gas to energy facility is also located on the property. Together these facilities help provide resource management opportunities for the surrounding community. If you are interested in touring any of the facilities listed above, please contact the landfill office at (585) 526-4420 and ask for Fred Kober or Carla Jordan to set up a tour time. Please feel free to pass along this invitation to anyone else you know who may be interested.


January 16, 2013

Good Morning! In an effort to provide landfill operations notifications in a timely manner, Casella will be testing out a Global Connect Reverse Call System. Individuals who have subscribed to these website notifications and have provided a phone number will be automatically enrolled in this call service. A test call is planned for later this week. If you had not previously provided a phone number, but would like to receive these calls, please email your name and phone number to carla.jordan@casella.com


January 16, 2013

Landfill staff has been notified this morning, that the landfill gas to energy facility, operated by Innovative Energy, will be going offline at 10AM, January 16, 2013. The plant will be taken offline for utlility connections associated with their new expanded plant. It is anticipated that the plant will only be offline for the afternoon, and should be back up and operating at the end of the day. In the interim, landfill staff will be operating all flares to aid in the combustion of the collected gas. Should you have any questions please feel free to contact Fred Kober at 585.526.4420. Thanks.


December 11, 2012

Landfill staff have been notified by IES (the landfill gas to energy facility operators) that their plant will be going offline tomorrow, December 12, 2012. The energy plant will be offline for the day, so that they can install condensate infrastructure associated with their new 3 engine expansion building. It is anticipated that the plant will not be offline for more than one day. During this period of time, the landfill will have all of their flares operating to combust the gas that is collected. Should you have any questions, please contact Landfill General Manager, Fred Kober at (585)526-4420.


November 28, 2012

The small open flare (located west of the active landfill) will be manually shut down today between the hours of 11AM - 3PM so that new gas collection piping may be tied in to the system. Should you have any questions or comments, please call Landfill General Manager, Fred Kober, at 585.526.4420.


November 6, 2012

Please note....landfill contractors will be onsite excavating waste over the next few days in order to make necessary improvements to the leachate collection system. Waste will need to be excavated in order to replace stone that has been silted in. The contractors will be working as quickly as possible to ensure that the improvements are made in a timely matter. It is anticipated that the work will be completed by the end of the week (11/9). During the period of waste excavation, landfill gas odor and waste odor may be noticeable in the area immediately surrounding the landfill. Should you have any questions please contact Fred Kober at (585) 526-4420.


October 29, 2012

The landfill will be opening late tomorrow morning (10/30/12). Due to the forecasted high winds, the landfill will not begin accepting waste until 11AM. Additional changes may be made to the operating hours based on the weather conditions encountered. Should you have any questions regarding whether the landfill is accepting waste, please feel free to contact the landfill office at (585) 526-4420.


October 23, 2012

All 4 Facility flares will experience periods of start up and shut down over the course of the next 4 days. The flares will be shut down for required annual maintenance. They should not be off line for more than 5 hours each. Only one flare will be shut down at a time. During this maintenance period, the landfill gas to energy facility will continue to be operational.


October 8, 2012

One of the Facility's open flares was manually shut down at 10:15 this morning. The flare was turned off so that gas wells and piping that were recently installed can be connected to our active gas collection system. The flare should be turned back on, and resume normal operation, by 4:30 this afternoon (baring any complications with the construction tie in). If you have any questions, please contact Fred Kober at the landfill office (585.526.4420).


October 2, 2012

Please note...the active gas landfilll flares and landfill gas-to-energy facility were shut down at approximately 9AM this morning, October 2nd. The combustion devices had to be shut off due to a landfill gas line being puncture by equipment that is currently onsite to install more gas collection wells. The gas header was immediately repaired and the flares and gas plant were all operational again by 11AM. Please feel free to contact the landfill office and ask for Fred Kober or Carla Jordan if you have any questions regarding this event.


September 26, 2012

The landfill will be adding 12 vertical wells to their existing landfill gas collection system. These wells will be concentrated in the newer areas of the landfill. The contractor has mobilized to the site and will begin drilling this afternoon. During the time that this construction occurs, landfill gas odors may be noticeable in the immediate vicinity of the landfill. The duration of the construction is anticipated to be no more than 2 weeks, weather permitting. Should you have any questions, please feel free to contact the landfill at 585.526.4420 and ask for Fred Kober or Carla Jordan.


September 20, 2012

The registration for our annual Household Hazardous Waste Collection event will close tomorrow, Friday September 21, 2012, at 3:30PM. The event is being held Saturday, September 22, 2012 at the Casella Recycling building and is open to Ontario County residents only. Pre-registration is required. Please call the landfill office (585.526.4420) before 3:30PM on the 21st to register.

Available Positions...

All jobs listed below are at this provider location.